Please use this identifier to cite or link to this item: http://ir.library.ui.edu.ng/handle/123456789/1999
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAdeyeye, A. D.-
dc.contributor.authorCharles-Owaba, O. E.-
dc.date.accessioned2018-10-11T09:47:41Z-
dc.date.available2018-10-11T09:47:41Z-
dc.date.issued1999-
dc.identifier.otherProceedings of Nigerian Institute of Industrial Engineers, pp. 89-100-
dc.identifier.otherui_inpro_adeyeye_biobjective_1999-
dc.identifier.urihttp://ir.library.ui.edu.ng/handle/123456789/1999-
dc.description.abstractA biobjective model is proposed for production planning in a multi-stage, multi-facility production system. The decision situation considered was a case where the Decision Maker (DM) wants to determine the quantities of materials to be fed into each production facility at each stage of production that gives maximal realization of his objectives. A numerical example is solved using three Linear Programming procedures. The methods used are: Compromise Constraint Biobjective LP (CCBLP), Linear Combination of the Objective Functions (LCOF) and Goal Programming (GP). The behaviour of the CCBLP model shows that it is superior to LCOF and non-preemptive GP in terms of its sensitivity to relaxations in the objectives. It also supports the result of an earlier research that the CCBLP gives the real compromise solution.en_US
dc.language.isoenen_US
dc.publisherNigerian Metallurgical Societyen_US
dc.titleA biobjective production planning model and application of three LP proceduresen_US
dc.typePresentationen_US
Appears in Collections:scholarly works

Files in This Item:
File Description SizeFormat 
(13)ui_inpro_adeyeye_biobjective_1999.pdf3.49 MBAdobe PDFThumbnail
View/Open


Items in UISpace are protected by copyright, with all rights reserved, unless otherwise indicated.