scholarly works Collection home page

Browse
Subscribe to this collection to receive daily e-mail notification of new additions RSS Feed RSS Feed RSS Feed
Collection's Items (Sorted by Submit Date in Descending order): 101 to 117 of 117
Issue DateTitleAuthor(s)
2008Predicting students academic performance using artificial neural network: a case study of an engineering courseOladokun, V. O.; Adebanjo, A. T.; Charles-Owaba, O. E.
2007A subtour-free set-sequencing algorithm based computer software for solving the machine set-up problemCharles-owaba, O. E.; Oladokun, V. O.
2009-12Application of a neurofuzzy mathematical model in the development of a local oven designOdior, A. O.; Oyawale, F. A.; Charles-Owaba, O. E.
2007An ergonomic and safty evaluation of footwear used by male industrial workers in Nigeria: a case studyOladokun, V. O.; Onwusika, N. I.
2004Improving capacity utilization through material handling automation: a case study of a food processing plant.Oladokun, V. O.; Eze, A. I
2012Application of fuzzy logic to the optimal location of public utilities: a case study of pedestrian bridges.Oladokun, V. O.; Okesiji, O. O
2010-01Application of job scheduling in small scale rice milling firmOdior, A. O.; Charles-Owaba, O. E.; Oyawale, F. A.
2008A facility maintenance scheduling model incorporating opportunity and inflationary costsCharles-Owaba, O. E.; Oluleye, A. E.; Oyawale, F. A.; Oke, S. A.
2006An application of artificial neural network to maintenance managementOladokun, V. O.; Charles-Owaba, O. E.; Nwaozuru, C. S.
2010Application of mathematical model to job scheduling in an oil processing firm in NigeriaOdior, A. O.; Oyawale, F. A.
2008Application of mathematical model to optimization of the production capacity of paint manufacturing companyOdior, A. O.; Oyawale, F. A.
2009Application of mathematical model to the production capacity of a yam flour producing companyOdior, A. O.; Oyawale, F. A.; Orsarh, E. S.
2010-06Neuro - Puzzy Analysis for Silicon Carbide:Abrasive Grains ProductionOdior, A. O.; Oyawale, F. A.; Charles-Owaba, O. E.
2003Optimizing investments' cash flow: a scheduling approach.Oladokun, V. O.
2009An algorithm for job scheduling in 2 - machine flow shop problemOdior, A. O.; Oyawale, F. A.
1999A set of sequencing heuristic and the computer code for the TSP.Charles-Owaba, O. E.; Oladokun, V. O.
2005Design and fabrication of a cassava peeling machineAkintunde, B. O.; Oyawale, F. A.; Tunde-Akintunde, T. Y.
Collection's Items (Sorted by Submit Date in Descending order): 101 to 117 of 117