Assessment of household energy utilization in Ibadan, Southwestern Nigeria

dc.contributor.authorWaheed, M. A.
dc.contributor.authorOni, A. O.|
dc.contributor.authorFadare, D. A.
dc.contributor.authorSulaiman, M. A.
dc.date.accessioned2018-10-11T12:03:16Z
dc.date.available2018-10-11T12:03:16Z
dc.date.issued2012
dc.description.abstractEnergy and exergy analysis was conducted for a vegetable oil refinery in the Southwest of Nigeria. The plant, powered by two boilers and a 500 kVA generator, refines 100 tonnes of crude palm kernel oil (CPKO) into edible vegetable oil per day. The production system consists of four main group operations: neutralizer, bleacher, filter, and deodorizer. The performance of the plant was evaluated by considering energy and exergy losses of each unit operation of the production process. The energy intensity for processing 100 tonnes of palm kennel oil into edible oil was estimated as 487.04 MJ/tonne with electrical energy accounting for 4.65%, thermal energy, 95.23% and manual energy, 0.12%. The most energy intensive group operation was the deodorizer accounting for 56.26% of the net energy input. The calculated exergy efficiency of the plant is 38.6% with a total exergy loss of 29,919 MJ. Consequently, the exergy analysis revealed that the deodorizer is the most inefficient group operation accounting for 52.41% of the losses in the production processes. Furthermore, a critical look at the different component of the plant revealed that the boilers are the most inefficient units accounting for 69.7% of the overall losses. Other critical points of exergy losses of the plant were also identified. The increase in the total capacity of the plant was suggested in order to reduce the heating load of the boilers. Furthermore, the implementation of appropriate process heat integration can also help to improve the energy efficiency of the system. The suggestion may help the company to reduce its high expenditure on energy and thus improve the profit margin.en_US
dc.identifier.issn1947-3818
dc.identifier.urihttp://ir.library.ui.edu.ng/handle/123456789/2078
dc.language.isoenen_US
dc.publisherScientific Researchen_US
dc.titleAssessment of household energy utilization in Ibadan, Southwestern Nigeriaen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Thumbnail Image
Name:
(35)ui_art_waheed_assessment_201212 (42.pdf
Size:
1.64 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections