A bi-criteria algorithm for the simultaneous minimization of makespan and number of tardy jobs on a single machine with sequence dependent set-up time

dc.contributor.authorOladokun, V. O.
dc.contributor.authorChalres-Owaba, O. E.
dc.contributor.authorOlaosebikan, F. O.
dc.date.accessioned2018-10-10T15:45:22Z
dc.date.available2018-10-10T15:45:22Z
dc.date.issued2011
dc.description.abstractScheduling models based on efficient resources utilization without sufficient consideration for customer satisfaction or vice-visa is inadequate in many real-life multi-criteria scheduling problems. This work was aimed at the development of a bi-criteria algorithm for the simultaneous optimization of Makespan (Cmax) and Number of tardy jobs (NT) in a single machine problem with Sequence dependent set-up time. An existing single criterion algorithm, the Set Sequencing Algorithm, was adapted to solve the bi-criteria problem, Graphical User Interface (GUI) based software of the new algorithm was developed and its performance was evaluated with a real life problem and 150 randomly generated problems, with problem sizes ranging from between 20 and 150. The values of Crnax and NT of the solution sequences were analysed. The output sequences gave an average reduction of 32.1 0% in both measures of performance compared with the input sequences. The software was also shown to be user friendly. It is concluded that Set sequencing Algorithm is suitable for bi criteria scheduling optimizationen_US
dc.identifier.issn2040-7467
dc.identifier.otherResearch Journal of Applied Science, Engineering and Technology 3(9), pp. 1048-1051
dc.identifier.otherui_art_oladokun_bi-criteria_2011
dc.identifier.urihttp://ir.library.ui.edu.ng/handle/123456789/1834
dc.language.isoenen_US
dc.publisherMaxwell Scientific Organizationen_US
dc.subjectAlgorithm,en_US
dc.subjectmachine set-up,en_US
dc.subjectscheduling,en_US
dc.subjectset sequencing,en_US
dc.subjecttraveling salesmanen_US
dc.titleA bi-criteria algorithm for the simultaneous minimization of makespan and number of tardy jobs on a single machine with sequence dependent set-up timeen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Thumbnail Image
Name:
(16)ui_art_oladokun_bi-criteria_2011.pdf
Size:
439.7 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections